click here for larger image
 

OPERATED BY: Akcansa Cimento Sanayi ve Ticaret A.S.
ADDRESS: Akcansa Cimento Sanayii A.S. P.K. 8 Ezine 17600 Canakkale, Turkey
TELEPHONE: (286) 658 72 00/10 Lines
FAX: (286) 628 72 10
LOCATION: 39° 52' 48" N, 26° 09' 15" E across the Bozcaada.
MAX.SIZE: draft for the port is 13.0 m..
DESCRIPTION: Maritime transportation is the preferred means of shipment for Akcansa's import, export and a considerable portion of local trade. Cannakale and Ambarli ports and terminals located in Aliaga and Karamursel serve to this end. Akçansa Ports, run by modern principles of port management, for the handling of all kinds of bulk load and other cargo also serves third parties. The pier serves the cement works for imports and exports of cement and raw materials by conveyor systems. The factory has production capacity of 5.000 mts/day
ANCHORAGE AREAS: Vessels may anchor front of the pier. (Information on best location of anchorage will be given by Pilot station)
PILOTAGE: : is compulsory for berthing and unberthing and anchoring, provided by the Akcansa Pilot.VHF channels 10, 16.
TOWAGE: and/or mooring boat compulsory arranged by pilot and and provided by the UZMAR Denizcilik Izmir.
BERTHING: Docking for all types of vessels up to 50.000 dwt. Ability to serve 5 vessels simultaneously. Depth of 13 meters, 925 meter docks

BERTHS NO LENGTH (m) DEPTH (m) BERTH GROUPS
1 251 -13.50 Bulk / Gen.Cargo (konveyor)
2 209 -13.50 Bulk / Gen.Cargo (konveyor)
3 208 -5 Bulk / Gen.Cargo /Ro-Ro Ramp
Vessel has to be standing-by due unexpected strong winds

CARGO HANDLED: operations of all kind of bulk load and other cargo Loading rate bulk cement: 6.000tons/day, Loading rate bulk clinker : 8.000tons/day, Discharging rate bulk 5.000tons/day.
CARGO HANDLING EQUIPMENTS: Mobil Cranes; 1x90tons, 1x60tons Fork lifts; 3 x 4tons, 6x4.5tons, There is special equipment available to discharge scrap, logs, paper etc..Weigh-bridge 80 tons.
STORAGE AREA: There is 10.000 sq.m.open storage area and cement silos 6x8.000tons.
DENSITY: 1027
FRESH WATER: available at pier rate apprx. 15 tons/hr.
BUNKER: available by barge or by trucks.
WORKING HOURS: operates 24 hours a day year round.
AIRPORT: At Istanbul distance apprx. 375 km from the port.
GARBAGE REMOVAL: service is not available.
WASTE OIL DISPOSAL: service is not available.
DEVELOPMENTS: A new port at Kepez Point is under construction.

DOCUMENTS AND GENERAL VIEWS: of these port; please see "A General View of Turkish Ports" in the ports of Turkey section.

 

Turkish Straits Guide

Weather Conditions

Repairs / Fly-team Support

Ship Chandling

Istanbul

New York

Singapore

London